24-Hour Emergency Diesel Spill Response at a National Freight Distribution Centre

Project: Emergency diesel spill containment and recovery

Customer: David Cranston

Company: Cranston Freight and Distribution

Location: Doncaster, South Yorkshire

Facility Size: 72,400m²

Spill Volume: Approximately 16,800 litres

Affected Area: 4,260m²

Emergency Response Time: 85 minutes

Project Value: £42,800

Project Duration: 4 days

Services: 24-hour spill response, emergency spill response, diesel spill response, spill clean-up and spill waste disposal

The Customer's Requirements

Cranston Freight and Distribution experienced a substantial diesel spill following a failure within its commercial vehicle fuel storage and transfer infrastructure.

The incident occurred overnight, releasing approximately 16,800 litres of diesel across vehicle refuelling areas, loading bays and internal access roads.

The distribution centre accommodated approximately 240 commercial vehicle movements daily and operated continuously throughout the week.

The customer required immediate emergency spill response services to contain the diesel, protect the drainage infrastructure and minimise disruption to freight operations.

Emergency Spill Assessment

Spill Assist mobilised specialist response personnel, vacuum recovery vehicles and hydrocarbon containment equipment.

The initial incident assessment identified:

  • Approximately 4,260m² of contaminated hardstanding

  • Eleven potentially affected surface water drainage points

  • Diesel accumulation within vehicle loading areas

  • Contamination around fuel transfer infrastructure

  • Increased vehicle and pedestrian slip risks

  • Potential hydrocarbon migration towards adjoining land

Controlled working areas were established to separate the affected sections from ongoing distribution activities.

Diesel Spill Containment

The emergency response team deployed specialist hydrocarbon containment equipment to restrict further migration of the spilled diesel.

The containment programme incorporated:

  • 320 linear metres of hydrocarbon containment booms

  • Specialist oil-selective absorbent materials

  • Temporary protection across eleven drainage points

  • Liquid recovery barriers

  • Temporary recovered-fuel storage arrangements

The containment measures supported the controlled recovery of accumulated diesel from operational areas.

Bulk Diesel Recovery

Specialist vacuum tankers removed accumulated fuel and contaminated liquids from the affected hardstanding and accessible drainage infrastructure.

Approximately 15,400 litres of diesel and contaminated liquids were recovered during the initial recovery phase.

The recovered liquids were transferred through appropriate waste management arrangements, with contaminated absorbent materials collected separately.

Commercial Spill Clean-Up

The surface cleaning programme addressed four principal operational areas.

Affected Area

Cleaned Surface Area

Vehicle refuelling compound

1,240m²

Commercial loading bays

1,160m²

Internal access roads

1,380m²

Vehicle parking areas

480m²

Total

4,260m²

Specialist cleaning equipment removed residual hydrocarbon contamination from compatible hardstanding surfaces.

Approximately 8,600 litres of contaminated cleaning wastewater were recovered for appropriate disposal.

Drainage Assessment and Waste Disposal

Spill Assist inspected eleven drainage points and approximately 280 linear metres of accessible drainage infrastructure.

Contaminated liquids and residues were recovered from affected chambers and drainage channels.

The customer received waste transfer documentation, incident records and recommendations for continued environmental monitoring where required.

The Outcome

Cranston Freight and Distribution received a coordinated emergency response that supported the phased reinstatement of its distribution centre.

The project delivered:

  • Emergency attendance within 85 minutes

  • Response to approximately 16,800 litres of spilled diesel

  • Cleaning of 4,260m² of contaminated hardstanding

  • Recovery of approximately 24,000 litres of contaminated liquids

  • Assessment of eleven drainage points

  • Inspection of 280 linear metres of drainage infrastructure

  • Documented spill waste disposal

  • Phased reopening of commercial vehicle routes

The principal recovery and cleaning works were completed within four days and the agreed £42,800 budget.

Project Takeaway: A 24-hour diesel spill response supports continuous distribution operations because rapid containment, specialist liquid recovery and coordinated surface cleaning reduce the extent of operational disruption.

Hazardous Chemical Spill Response at a Large Industrial Processing Plant

Project: Industrial chemical spill containment and decontamination

Customer: Dr Peter Ashworth

Company: Ashworth Industrial Processing

Location: Runcorn, Cheshire

Facility Size: 42,800m²

Spill Volume: Approximately 11,200 litres

Affected Area: 2,180m²

Emergency Response Time: 110 minutes

Project Value: £68,400

Project Duration: 6 days

Services: Chemical spill response, hazardous spill response, industrial spill response and spill waste disposal

The Customer's Requirements

Ashworth Industrial Processing experienced a substantial chemical release following damage to bulk liquid transfer infrastructure within its processing facility.

Approximately 11,200 litres of acidic process solution escaped into a production building and adjoining chemical handling areas.

The incident presented potential risks to employees, processing equipment, structural surfaces and internal drainage infrastructure.

The customer required specialist hazardous spill response services capable of managing chemical contamination while protecting unaffected production areas.

Chemical Spill Risk Assessment

Spill Assist reviewed the relevant safety data sheets and incident information to assess the characteristics of the spilled substance.

The assessment considered:

  • Chemical composition and concentration

  • Corrosive properties

  • Potential employee exposure

  • Material compatibility

  • Internal drainage arrangements

  • Potential reactions with surrounding substances

  • Hazardous waste classification requirements

The response team coordinated its activities with the customer's health and safety representatives and production management personnel.

Hazardous Chemical Containment

Specialist chemical-compatible containment equipment restricted further contamination of the processing facility.

Controlled working areas prevented unauthorised access while protecting adjoining production zones.

The containment programme incorporated temporary drainage protection, compatible liquid barriers and specialist chemical recovery equipment.

Industrial Chemical Recovery

Spill Assist recovered approximately 10,400 litres of bulk chemical solution from the affected production areas.

The recovery programme addressed five principal contamination zones.

Contaminated Area

Surface Area

Chemical processing hall

820m²

Bulk transfer compound

460m²

Secondary production area

380m²

Service corridors

320m²

Equipment foundation areas

200m²

Total

2,180m²

Specialist recovery equipment was selected according to the chemical properties and identified hazards.

Chemical Decontamination

The decontamination programme addressed affected industrial flooring, equipment foundations, drainage channels and compatible structural surfaces.

Chemical residue testing supported the assessment of remaining contamination following cleaning.

Approximately 14,800 litres of contaminated liquids were collected across the bulk recovery and subsequent decontamination phases.

Additional contaminated materials, including used protective equipment and spent absorbents, were segregated for appropriate disposal.

Hazardous Spill Waste Disposal

Recovered chemical liquids and contaminated solid materials were classified according to their waste characteristics.

The waste management programme incorporated:

  • Suitable temporary containment

  • Waste segregation

  • Authorised hazardous waste transportation

  • Appropriate treatment and disposal arrangements

  • Hazardous waste consignment documentation

Spill Assist provided incident records detailing recovered waste streams, decontamination activities and outstanding environmental considerations.

The Outcome

Ashworth Industrial Processing received a coordinated hazardous chemical spill response tailored to the operational requirements of its processing facility.

The project delivered:

  • Emergency attendance within 110 minutes

  • Response to approximately 11,200 litres of spilled chemical solution

  • Decontamination of 2,180m² of industrial surfaces

  • Recovery of approximately 14,800 litres of contaminated liquids

  • Controlled hazardous waste management

  • Chemical residue assessment

  • Phased reinstatement of production areas

  • Comprehensive incident documentation

The principal containment, recovery and decontamination works were completed within six days and the agreed £68,400 budget.

Project Takeaway: Specialist hazardous chemical spill response reduces industrial contamination risks because substance-specific recovery methods and controlled waste disposal address the hazards associated with corrosive materials.

Industrial Hydraulic Oil Spill Clean-Up Across Four Manufacturing Facilities

Project: Multi-site industrial oil spill recovery and cleaning programme

Customer: Malcolm Ridgway

Company: Ridgway Automotive Components

Location: Wolverhampton, Coventry, Telford and Worcester

Number of Manufacturing Facilities: 4

Combined Facility Area: 86,400m²

Combined Spill Volume: Approximately 7,800 litres

Combined Affected Area: 3,640m²

Project Value: £54,600

Combined Project Duration: 12 working days

Services: Industrial spill response, oil spill response, spill clean-up and spill waste disposal

The Customer's Requirements

Ridgway Automotive Components required specialist industrial spill response following four separate hydraulic and lubricating oil incidents across its manufacturing portfolio.

The incidents involved failures within hydraulic presses, automated manufacturing systems and industrial lubrication equipment.

Oil contamination affected production flooring, machinery foundations, maintenance corridors and internal drainage channels.

The customer required a consistent recovery and cleaning service that accommodated ongoing manufacturing activities and individual site requirements.

Industrial Oil Spill Incident Summary

Manufacturing Location

Spill Volume

Affected Area

Wolverhampton

2,800 litres

1,240m²

Coventry

2,100 litres

980m²

Telford

1,600 litres

760m²

Worcester

1,300 litres

660m²

Total

7,800 litres

3,640m²

Each incident received an individual assessment reflecting oil type, manufacturing processes, equipment configuration and contamination extent.

Wolverhampton Hydraulic Oil Spill

The Wolverhampton incident involved a hydraulic system failure within a heavy industrial pressing facility.

Approximately 2,800 litres of hydraulic oil escaped across production flooring and surrounding machinery foundations.

Spill Assist coordinated bulk liquid recovery, contaminated material collection and specialist industrial surface cleaning.

The recovery programme addressed 1,240m² of affected production space.

Coventry Manufacturing Oil Spill

A lubrication system failure resulted in approximately 2,100 litres of industrial oil contaminating an automated production area.

The response team recovered accumulated oil from accessible floor surfaces, equipment recesses and internal drainage channels.

Specialist cleaning addressed 980m² of industrial hardstanding and compatible machinery foundation surfaces.

Telford Hydraulic Fluid Recovery

The Telford incident involved damage to hydraulic equipment serving a commercial metal fabrication production line.

Approximately 1,600 litres of hydraulic fluid affected 760m² of production and maintenance areas.

Spill Assist established controlled working zones and coordinated cleaning activities around the customer's equipment maintenance programme.

Worcester Industrial Lubricant Spill

Approximately 1,300 litres of industrial lubricant escaped during a storage and handling incident at the Worcester facility.

The recovery programme addressed contaminated flooring, storage areas and adjoining operational corridors.

Specialist cleaning restored 660m² of affected industrial surfaces, subject to the customer's operational safety checks.

Industrial Spill Waste Management

The combined recovery programme generated:

  • Approximately 7,100 litres of recovered bulk oil and contaminated liquids

  • Approximately 9,400 litres of contaminated cleaning wastewater

  • Approximately 2.6 tonnes of spent absorbents and other contaminated solid materials

Waste streams were classified and managed through authorised recovery and disposal arrangements.

Individual incident reports provided a documented record of the completed activities at each manufacturing facility.

The Outcome

Ridgway Automotive Components received coordinated industrial oil spill response services across four manufacturing facilities.

The combined projects delivered:

  • Management of four separate industrial oil spill incidents

  • Response to approximately 7,800 litres of spilled oil

  • Cleaning of 3,640m² of manufacturing surfaces

  • Recovery of approximately 16,500 litres of contaminated liquids

  • Collection of 2.6 tonnes of contaminated solid materials

  • Phased reinstatement of affected production areas

  • Individual incident and waste management documentation

  • Consistent recovery procedures across all four facilities

The combined recovery and cleaning works were completed within 12 working days and the agreed £54,600 budget.

Project Takeaway: Industrial oil spill clean-up supports manufacturing continuity because coordinated recovery, surface decontamination and phased working arrangements allow unaffected production areas to remain operational where safe.

Contaminated Soil Removal and Environmental Remediation at a Former Fuel Storage Depot

Project: Large-scale hydrocarbon-contaminated land remediation

Customer: Elizabeth Fenwick

Company: Fenwick Commercial Land Developments

Location: Grimsby, Lincolnshire

Site Area: 28,400m²

Identified Remediation Area: 4,860m²

Contaminated Soil Removed: 3,240 tonnes

Project Value: £386,400

Project Duration: 45 working days

Services: Environmental remediation, contaminated soil removal, fuel spill response and spill waste disposal

The Customer's Requirements

Fenwick Commercial Land Developments acquired a former industrial fuel storage depot for redevelopment into a commercial logistics facility.

Preliminary ground investigations identified significant hydrocarbon contamination associated with historical fuel storage, transfer operations and underground infrastructure.

Contamination affected underlying soils and presented potential risks to groundwater and surrounding industrial properties.

The customer required a coordinated environmental remediation programme before progressing with the proposed redevelopment.

Environmental Site Investigation

Spill Assist coordinated detailed environmental investigations to establish the extent and characteristics of the contaminated land.

The investigation incorporated:

  • Thirty-six exploratory soil sampling locations

  • Eighteen trial pits

  • Eight groundwater monitoring wells

  • Laboratory analysis of selected soil and water samples

  • Assessment of redundant fuel storage infrastructure

  • Identification of potential contaminant migration pathways

The findings supported the development of a remediation strategy reflecting the proposed commercial land use.

Contaminated Land Remediation Strategy

The remediation programme divided the affected land into four principal excavation zones.

Remediation Zone

Affected Area

Soil Removed

Former bulk fuel storage compound

1,640m²

1,280 tonnes

Tanker loading and transfer area

1,280m²

860 tonnes

Underground pipework corridor

820m²

540 tonnes

Former vehicle maintenance area

1,120m²

560 tonnes

Total

4,860m²

3,240 tonnes

Excavation requirements reflected contamination concentrations, soil characteristics, groundwater conditions and future development plans.

Contaminated Soil Removal

Spill Assist coordinated the controlled excavation of approximately 3,240 tonnes of hydrocarbon-contaminated soil.

Excavated materials were segregated according to their contamination characteristics and appropriate waste classification.

The soil removal programme incorporated:

  • Controlled excavation of identified contamination zones

  • Suitable temporary storage arrangements

  • Waste classification and sampling

  • Authorised waste transportation

  • Appropriate contaminated soil treatment and disposal

  • Excavation validation sampling

The waste management strategy prioritised suitable recovery and treatment options where practicable.

Redundant Fuel Infrastructure Assessment

The former depot contained redundant underground fuel storage tanks, transfer pipelines and associated drainage infrastructure.

Spill Assist coordinated specialist contractors responsible for the appropriate decommissioning and removal of selected redundant infrastructure.

Residual hydrocarbons and contaminated materials were recovered and managed through suitable waste disposal arrangements.

Groundwater Monitoring and Hydrocarbon Recovery

Eight groundwater monitoring wells supported the assessment of possible contaminant migration.

Groundwater samples were collected for laboratory analysis to establish contamination trends and inform subsequent remediation activities.

Suitable hydrocarbon recovery methods were implemented where recoverable free-phase contamination was identified.

Ongoing monitoring requirements were documented separately from the principal excavation programme.

Environmental Validation and Site Reinstatement

Following contaminated soil removal, validation samples assessed residual contamination within the excavated zones.

Suitable replacement materials reinstated the excavations according to the agreed development specification.

The environmental remediation report incorporated:

  • Site investigation findings

  • Contamination assessments

  • Excavation records

  • Soil classification results

  • Waste transportation and disposal records

  • Laboratory validation results

  • Groundwater monitoring findings

  • Recommendations for continued environmental management

The documentation supported the customer's subsequent development decisions, subject to relevant regulatory requirements and outstanding monitoring conditions.

The Outcome

Fenwick Commercial Land Developments received a coordinated contaminated land remediation programme supporting its proposed logistics development.

The project delivered:

  • Environmental investigation of a 28,400m² former fuel depot

  • Remediation across 4,860m² of contaminated land

  • Excavation of 3,240 tonnes of contaminated soil

  • Installation of eight groundwater monitoring wells

  • Assessment of redundant fuel storage infrastructure

  • Controlled hydrocarbon recovery

  • Environmental validation sampling

  • Comprehensive waste management and remediation documentation

The principal remediation works were completed within 45 working days and the agreed £386,400 budget.

Project Takeaway: Contaminated soil removal supports commercial land redevelopment because targeted excavation, waste classification and environmental validation address historical pollution risks before construction progresses.

Emergency Petrol and Diesel Spill Response Across Six Commercial Fuel Forecourts

Project: Multi-site emergency fuel spill recovery and forecourt cleaning

Customer: Christopher Dalrymple

Company: Dalrymple National Forecourt Services

Location: Bristol, Swindon, Reading, Oxford, Gloucester and Cheltenham

Number of Fuel Forecourts: 6

Combined Spill Volume: Approximately 13,600 litres

Combined Affected Area: 5,120m²

Project Value: £84,750

Combined Project Duration: 15 working days

Services: Emergency spill response, 24-hour spill response, fuel spill response, diesel spill response and spill clean-up

The Customer's Requirements

Dalrymple National Forecourt Services required specialist emergency spill response across six commercial petrol stations following separate fuel delivery, storage and transfer incidents.

The incidents involved petrol and diesel contamination affecting customer refuelling areas, tanker delivery compounds and surface water drainage infrastructure.

The customer required rapid emergency attendance to manage environmental and safety risks while limiting disruption to forecourt trading operations.

Commercial Fuel Spill Incident Summary

Forecourt Location

Fuel Type

Spill Volume

Affected Area

Bristol

Diesel

3,200 litres

1,180m²

Swindon

Petrol

1,800 litres

740m²

Reading

Diesel

2,600 litres

960m²

Oxford

Petrol

1,400 litres

580m²

Gloucester

Diesel

2,800 litres

1,020m²

Cheltenham

Petrol

1,800 litres

640m²

Total

Petrol and diesel

13,600 litres

5,120m²

Each incident received a separate assessment based on fuel characteristics, contamination extent, drainage arrangements and ongoing forecourt activities.

Emergency Fuel Spill Attendance

Spill Assist coordinated specialist emergency response personnel and suitable recovery equipment across the six separate incidents.

Attendance times ranged from 65 to 115 minutes, depending on the incident location and response requirements.

The response teams coordinated their activities with forecourt management personnel and relevant emergency services where necessary.

Petrol and Diesel Spill Containment

The containment arrangements reflected the different characteristics and hazards associated with petrol and diesel.

Specialist equipment was selected according to the relevant substance, site conditions and identified risks.

The combined containment programme addressed:

  • Six commercial fuel delivery compounds

  • Multiple customer refuelling areas

  • Twenty-eight potentially affected drainage points

  • Contaminated vehicle circulation routes

  • Accessible oil-water separation infrastructure

  • Adjoining pedestrian and commercial areas

The response teams restricted access to affected areas during recovery and cleaning activities.

Commercial Fuel Recovery

Specialist fuel recovery equipment removed accessible accumulated petrol, diesel and contaminated liquids.

The combined recovery programme collected approximately 12,200 litres of bulk fuel and contaminated liquids.

Additional cleaning activities generated approximately 11,600 litres of contaminated wastewater.

Recovered materials were classified and managed through appropriate waste recovery and disposal arrangements.

Forecourt Cleaning and Drainage Assessment

Spill Assist coordinated the cleaning of 5,120m² of affected forecourt surfaces across the six locations.

The drainage assessment programme incorporated:

  • Inspection of twenty-eight drainage points

  • Assessment of approximately 460 linear metres of drainage infrastructure

  • Inspection of six oil-water separators

  • Recovery of contaminated liquids from accessible chambers

  • Investigation of potential downstream pollution pathways

Individual environmental assessments informed decisions regarding further cleaning, monitoring and reinstatement requirements.

Incident Reporting and Reopening

Each forecourt received incident documentation outlining the affected areas, containment activities, recovered materials and waste management arrangements.

The response teams coordinated with relevant site management personnel regarding the phased reopening of affected forecourt sections.

Where necessary, recommendations addressed continued environmental monitoring and infrastructure repairs by appropriate specialist contractors.

The Outcome

Dalrymple National Forecourt Services received coordinated emergency fuel spill response services across six commercial petrol stations.

The combined projects delivered:

  • Emergency attendance within 65 to 115 minutes

  • Management of six separate fuel spill incidents

  • Response to approximately 13,600 litres of spilled petrol and diesel

  • Cleaning of 5,120m² of forecourt surfaces

  • Recovery of approximately 23,800 litres of contaminated liquids

  • Assessment of twenty-eight drainage points

  • Inspection of six oil-water separators

  • Individual incident and waste disposal documentation

The combined recovery programme was completed within 15 working days and the agreed £84,750 budget.

Project Takeaway: Emergency forecourt spill response helps minimise commercial disruption because substance-specific containment, controlled fuel recovery and drainage assessment support the phased reinstatement of affected trading areas.

Oil Spill Response and Environmental Recovery at a Commercial Dockside Facility

Project: Large-scale dockside oil spill containment and environmental clean-up

Customer: Nicholas Fairburn

Company: Fairburn Maritime and Cargo Operations

Location: Hull, East Yorkshire

Dockside Facility Area: 92,600m²

Spill Volume: Approximately 21,400 litres

Affected Dockside Area: 4,680m²

Emergency Response Time: 100 minutes

Project Value: £136,800

Project Duration: 10 days

Services: Oil spill response, emergency spill response, industrial spill response, environmental remediation and spill waste disposal

The Customer's Requirements

Fairburn Maritime and Cargo Operations experienced a significant oil release following damage to industrial oil transfer infrastructure within its commercial dockside facility.

Approximately 21,400 litres of heavy fuel oil escaped onto operational quayside surfaces, with a proportion reaching adjacent dock waters.

The incident affected cargo handling operations and presented potential environmental risks to surrounding marine areas.

The customer required coordinated land-based and waterborne spill response services capable of managing substantial hydrocarbon contamination.

Environmental Spill Assessment

Spill Assist assessed the affected dockside areas in coordination with the customer's incident management representatives and relevant harbour personnel.

The initial assessment identified:

  • Approximately 4,680m² of contaminated dockside hardstanding

  • Oil accumulation around cargo handling infrastructure

  • Contaminated surface water drainage channels

  • Floating oil within adjacent dock waters

  • Potential migration towards neighbouring berths

  • Environmental risks associated with marine contamination

The recovery programme considered prevailing weather conditions, tidal influences, vessel movements and operational restrictions.

Marine Oil Spill Containment

Specialist marine containment equipment restricted the movement of floating hydrocarbons where environmental conditions permitted.

The containment programme incorporated:

  • Approximately 680 linear metres of floating containment booms

  • 420 linear metres of oil-selective absorbent booms

  • Temporary dockside liquid containment barriers

  • Specialist hydrocarbon absorbent materials

  • Drainage protection equipment

The response team monitored containment performance throughout the recovery operation.

Marine and Dockside Oil Recovery

Spill Assist coordinated specialist vacuum recovery vehicles and suitable waterborne oil recovery equipment.

The recovery programme addressed accumulated hydrocarbons across the dockside and accessible floating oil within the affected water environment.

Approximately 32,800 litres of oil-water mixture and contaminated liquids were recovered during the principal recovery phase.

The recovered volume exceeded the original spill volume because the collected liquids included water and other contaminated residues.

Industrial Dockside Surface Cleaning

The surface cleaning programme addressed four principal operational areas.

Contaminated Area

Cleaned Surface Area

Main cargo handling compound

1,680m²

Oil transfer infrastructure area

1,240m²

Quayside access routes

1,160m²

Equipment storage compound

600m²

Total

4,680m²

Suitable cleaning equipment removed residual oil contamination from compatible operational surfaces.

Approximately 9,200 litres of contaminated cleaning liquids were recovered for appropriate treatment and disposal.

Spill Waste Disposal

The combined waste recovery programme generated:

  • Approximately 32,800 litres of oil-water mixture and contaminated liquids

  • Approximately 9,200 litres of contaminated cleaning wastewater

  • Approximately 5.4 tonnes of spent absorbents and contaminated solid materials

Recovered materials were classified, segregated and transported through authorised waste management arrangements.

Waste records documented the recovered quantities and relevant treatment or disposal destinations.

Environmental Monitoring and Remediation

Environmental monitoring assessed residual contamination within affected dockside and adjacent water environments.

The response programme incorporated inspection of accessible drainage infrastructure and assessment of potential contamination migration beyond the immediate incident area.

Localised remediation addressed contaminated materials around selected infrastructure and perimeter areas.

Recommendations for continued monitoring were coordinated with the customer's environmental representatives and relevant authorities where required.

The Outcome

Fairburn Maritime and Cargo Operations received an integrated emergency oil spill response addressing contamination across land and water environments.

The project delivered:

  • Emergency attendance within 100 minutes

  • Response to approximately 21,400 litres of spilled heavy fuel oil

  • Deployment of 680 linear metres of floating containment booms

  • Cleaning of 4,680m² of operational dockside surfaces

  • Recovery of approximately 42,000 litres of contaminated liquids

  • Collection of 5.4 tonnes of contaminated solid materials

  • Environmental monitoring and targeted remediation

  • Documented spill waste management

  • Phased reinstatement of dockside cargo operations

The principal containment, recovery and environmental clean-up works were completed within ten days and the agreed £136,800 budget.

Project Takeaway: Specialist marine oil spill response reduces environmental pollution risks because coordinated waterborne containment, land-based recovery and environmental monitoring address hydrocarbon contamination across interconnected operational areas.

Contact Spill Assist

Spill Assist provides 24-hour emergency spill response, chemical spill response, contaminated soil removal, diesel spill response, environmental remediation, fuel spill response, hazardous spill response, industrial spill response, oil spill response, spill clean-up and spill waste disposal services throughout the UK.

Our team supports commercial property owners, industrial manufacturers, transport operators, fuel storage facilities, construction companies and marine operators following accidental spill incidents and historical environmental contamination.

We coordinate specialist containment, recovery, cleaning and remediation services according to the substance involved, incident severity, operational requirements and environmental risks.

Contact Spill Assist today to discuss your emergency spill response and environmental remediation requirements.

Get in Touch

We aim to get back to you in 1 working day.


Skip to

Privacy Information

Contact

Spill Assist
Trading style of RSM Fuel Services Limited
Lumbrook Mills
Westercroft Lane
HX3 7TY

Spill Assist is a trading style of RSM Fuel Services Limited Limited, registered in England & Wales (company no. 14512003).