Spill Assist provides 24-hour emergency spill response, industrial spill clean-up, hazardous waste disposal and environmental remediation services throughout the UK.
Our projects cover commercial fuel storage facilities, manufacturing plants, distribution centres, construction sites, chemical processing facilities and environmentally sensitive locations.
Project: Emergency diesel spill containment and recovery
Customer: David Cranston
Company: Cranston Freight and Distribution
Location: Doncaster, South Yorkshire
Facility Size: 72,400m²
Spill Volume: Approximately 16,800 litres
Affected Area: 4,260m²
Emergency Response Time: 85 minutes
Project Value: £42,800
Project Duration: 4 days
Services: 24-hour spill response, emergency spill response, diesel spill response, spill clean-up and spill waste disposal
Cranston Freight and Distribution experienced a substantial diesel spill following a failure within its commercial vehicle fuel storage and transfer infrastructure.
The incident occurred overnight, releasing approximately 16,800 litres of diesel across vehicle refuelling areas, loading bays and internal access roads.
The distribution centre accommodated approximately 240 commercial vehicle movements daily and operated continuously throughout the week.
The customer required immediate emergency spill response services to contain the diesel, protect the drainage infrastructure and minimise disruption to freight operations.
Spill Assist mobilised specialist response personnel, vacuum recovery vehicles and hydrocarbon containment equipment.
The initial incident assessment identified:
Approximately 4,260m² of contaminated hardstanding
Eleven potentially affected surface water drainage points
Diesel accumulation within vehicle loading areas
Contamination around fuel transfer infrastructure
Increased vehicle and pedestrian slip risks
Potential hydrocarbon migration towards adjoining land
Controlled working areas were established to separate the affected sections from ongoing distribution activities.
The emergency response team deployed specialist hydrocarbon containment equipment to restrict further migration of the spilled diesel.
The containment programme incorporated:
320 linear metres of hydrocarbon containment booms
Specialist oil-selective absorbent materials
Temporary protection across eleven drainage points
Liquid recovery barriers
Temporary recovered-fuel storage arrangements
The containment measures supported the controlled recovery of accumulated diesel from operational areas.
Specialist vacuum tankers removed accumulated fuel and contaminated liquids from the affected hardstanding and accessible drainage infrastructure.
Approximately 15,400 litres of diesel and contaminated liquids were recovered during the initial recovery phase.
The recovered liquids were transferred through appropriate waste management arrangements, with contaminated absorbent materials collected separately.
The surface cleaning programme addressed four principal operational areas.
Affected Area | Cleaned Surface Area |
|---|---|
Vehicle refuelling compound | 1,240m² |
Commercial loading bays | 1,160m² |
Internal access roads | 1,380m² |
Vehicle parking areas | 480m² |
Total | 4,260m² |
Specialist cleaning equipment removed residual hydrocarbon contamination from compatible hardstanding surfaces.
Approximately 8,600 litres of contaminated cleaning wastewater were recovered for appropriate disposal.
Spill Assist inspected eleven drainage points and approximately 280 linear metres of accessible drainage infrastructure.
Contaminated liquids and residues were recovered from affected chambers and drainage channels.
The customer received waste transfer documentation, incident records and recommendations for continued environmental monitoring where required.
Cranston Freight and Distribution received a coordinated emergency response that supported the phased reinstatement of its distribution centre.
The project delivered:
Emergency attendance within 85 minutes
Response to approximately 16,800 litres of spilled diesel
Cleaning of 4,260m² of contaminated hardstanding
Recovery of approximately 24,000 litres of contaminated liquids
Assessment of eleven drainage points
Inspection of 280 linear metres of drainage infrastructure
Documented spill waste disposal
Phased reopening of commercial vehicle routes
The principal recovery and cleaning works were completed within four days and the agreed £42,800 budget.
Project Takeaway: A 24-hour diesel spill response supports continuous distribution operations because rapid containment, specialist liquid recovery and coordinated surface cleaning reduce the extent of operational disruption.
Project: Industrial chemical spill containment and decontamination
Customer: Dr Peter Ashworth
Company: Ashworth Industrial Processing
Location: Runcorn, Cheshire
Facility Size: 42,800m²
Spill Volume: Approximately 11,200 litres
Affected Area: 2,180m²
Emergency Response Time: 110 minutes
Project Value: £68,400
Project Duration: 6 days
Services: Chemical spill response, hazardous spill response, industrial spill response and spill waste disposal
Ashworth Industrial Processing experienced a substantial chemical release following damage to bulk liquid transfer infrastructure within its processing facility.
Approximately 11,200 litres of acidic process solution escaped into a production building and adjoining chemical handling areas.
The incident presented potential risks to employees, processing equipment, structural surfaces and internal drainage infrastructure.
The customer required specialist hazardous spill response services capable of managing chemical contamination while protecting unaffected production areas.
Spill Assist reviewed the relevant safety data sheets and incident information to assess the characteristics of the spilled substance.
The assessment considered:
Chemical composition and concentration
Corrosive properties
Potential employee exposure
Material compatibility
Internal drainage arrangements
Potential reactions with surrounding substances
Hazardous waste classification requirements
The response team coordinated its activities with the customer's health and safety representatives and production management personnel.
Specialist chemical-compatible containment equipment restricted further contamination of the processing facility.
Controlled working areas prevented unauthorised access while protecting adjoining production zones.
The containment programme incorporated temporary drainage protection, compatible liquid barriers and specialist chemical recovery equipment.
Spill Assist recovered approximately 10,400 litres of bulk chemical solution from the affected production areas.
The recovery programme addressed five principal contamination zones.
Contaminated Area | Surface Area |
|---|---|
Chemical processing hall | 820m² |
Bulk transfer compound | 460m² |
Secondary production area | 380m² |
Service corridors | 320m² |
Equipment foundation areas | 200m² |
Total | 2,180m² |
Specialist recovery equipment was selected according to the chemical properties and identified hazards.
The decontamination programme addressed affected industrial flooring, equipment foundations, drainage channels and compatible structural surfaces.
Chemical residue testing supported the assessment of remaining contamination following cleaning.
Approximately 14,800 litres of contaminated liquids were collected across the bulk recovery and subsequent decontamination phases.
Additional contaminated materials, including used protective equipment and spent absorbents, were segregated for appropriate disposal.
Recovered chemical liquids and contaminated solid materials were classified according to their waste characteristics.
The waste management programme incorporated:
Suitable temporary containment
Waste segregation
Authorised hazardous waste transportation
Appropriate treatment and disposal arrangements
Hazardous waste consignment documentation
Spill Assist provided incident records detailing recovered waste streams, decontamination activities and outstanding environmental considerations.
Ashworth Industrial Processing received a coordinated hazardous chemical spill response tailored to the operational requirements of its processing facility.
The project delivered:
Emergency attendance within 110 minutes
Response to approximately 11,200 litres of spilled chemical solution
Decontamination of 2,180m² of industrial surfaces
Recovery of approximately 14,800 litres of contaminated liquids
Controlled hazardous waste management
Chemical residue assessment
Phased reinstatement of production areas
Comprehensive incident documentation
The principal containment, recovery and decontamination works were completed within six days and the agreed £68,400 budget.
Project Takeaway: Specialist hazardous chemical spill response reduces industrial contamination risks because substance-specific recovery methods and controlled waste disposal address the hazards associated with corrosive materials.
Project: Multi-site industrial oil spill recovery and cleaning programme
Customer: Malcolm Ridgway
Company: Ridgway Automotive Components
Location: Wolverhampton, Coventry, Telford and Worcester
Number of Manufacturing Facilities: 4
Combined Facility Area: 86,400m²
Combined Spill Volume: Approximately 7,800 litres
Combined Affected Area: 3,640m²
Project Value: £54,600
Combined Project Duration: 12 working days
Services: Industrial spill response, oil spill response, spill clean-up and spill waste disposal
Ridgway Automotive Components required specialist industrial spill response following four separate hydraulic and lubricating oil incidents across its manufacturing portfolio.
The incidents involved failures within hydraulic presses, automated manufacturing systems and industrial lubrication equipment.
Oil contamination affected production flooring, machinery foundations, maintenance corridors and internal drainage channels.
The customer required a consistent recovery and cleaning service that accommodated ongoing manufacturing activities and individual site requirements.
Manufacturing Location | Spill Volume | Affected Area |
|---|---|---|
Wolverhampton | 2,800 litres | 1,240m² |
Coventry | 2,100 litres | 980m² |
Telford | 1,600 litres | 760m² |
Worcester | 1,300 litres | 660m² |
Total | 7,800 litres | 3,640m² |
Each incident received an individual assessment reflecting oil type, manufacturing processes, equipment configuration and contamination extent.
The Wolverhampton incident involved a hydraulic system failure within a heavy industrial pressing facility.
Approximately 2,800 litres of hydraulic oil escaped across production flooring and surrounding machinery foundations.
Spill Assist coordinated bulk liquid recovery, contaminated material collection and specialist industrial surface cleaning.
The recovery programme addressed 1,240m² of affected production space.
A lubrication system failure resulted in approximately 2,100 litres of industrial oil contaminating an automated production area.
The response team recovered accumulated oil from accessible floor surfaces, equipment recesses and internal drainage channels.
Specialist cleaning addressed 980m² of industrial hardstanding and compatible machinery foundation surfaces.
The Telford incident involved damage to hydraulic equipment serving a commercial metal fabrication production line.
Approximately 1,600 litres of hydraulic fluid affected 760m² of production and maintenance areas.
Spill Assist established controlled working zones and coordinated cleaning activities around the customer's equipment maintenance programme.
Approximately 1,300 litres of industrial lubricant escaped during a storage and handling incident at the Worcester facility.
The recovery programme addressed contaminated flooring, storage areas and adjoining operational corridors.
Specialist cleaning restored 660m² of affected industrial surfaces, subject to the customer's operational safety checks.
The combined recovery programme generated:
Approximately 7,100 litres of recovered bulk oil and contaminated liquids
Approximately 9,400 litres of contaminated cleaning wastewater
Approximately 2.6 tonnes of spent absorbents and other contaminated solid materials
Waste streams were classified and managed through authorised recovery and disposal arrangements.
Individual incident reports provided a documented record of the completed activities at each manufacturing facility.
Ridgway Automotive Components received coordinated industrial oil spill response services across four manufacturing facilities.
The combined projects delivered:
Management of four separate industrial oil spill incidents
Response to approximately 7,800 litres of spilled oil
Cleaning of 3,640m² of manufacturing surfaces
Recovery of approximately 16,500 litres of contaminated liquids
Collection of 2.6 tonnes of contaminated solid materials
Phased reinstatement of affected production areas
Individual incident and waste management documentation
Consistent recovery procedures across all four facilities
The combined recovery and cleaning works were completed within 12 working days and the agreed £54,600 budget.
Project Takeaway: Industrial oil spill clean-up supports manufacturing continuity because coordinated recovery, surface decontamination and phased working arrangements allow unaffected production areas to remain operational where safe.
Project: Large-scale hydrocarbon-contaminated land remediation
Customer: Elizabeth Fenwick
Company: Fenwick Commercial Land Developments
Location: Grimsby, Lincolnshire
Site Area: 28,400m²
Identified Remediation Area: 4,860m²
Contaminated Soil Removed: 3,240 tonnes
Project Value: £386,400
Project Duration: 45 working days
Services: Environmental remediation, contaminated soil removal, fuel spill response and spill waste disposal
Fenwick Commercial Land Developments acquired a former industrial fuel storage depot for redevelopment into a commercial logistics facility.
Preliminary ground investigations identified significant hydrocarbon contamination associated with historical fuel storage, transfer operations and underground infrastructure.
Contamination affected underlying soils and presented potential risks to groundwater and surrounding industrial properties.
The customer required a coordinated environmental remediation programme before progressing with the proposed redevelopment.
Spill Assist coordinated detailed environmental investigations to establish the extent and characteristics of the contaminated land.
The investigation incorporated:
Thirty-six exploratory soil sampling locations
Eighteen trial pits
Eight groundwater monitoring wells
Laboratory analysis of selected soil and water samples
Assessment of redundant fuel storage infrastructure
Identification of potential contaminant migration pathways
The findings supported the development of a remediation strategy reflecting the proposed commercial land use.
The remediation programme divided the affected land into four principal excavation zones.
Remediation Zone | Affected Area | Soil Removed |
|---|---|---|
Former bulk fuel storage compound | 1,640m² | 1,280 tonnes |
Tanker loading and transfer area | 1,280m² | 860 tonnes |
Underground pipework corridor | 820m² | 540 tonnes |
Former vehicle maintenance area | 1,120m² | 560 tonnes |
Total | 4,860m² | 3,240 tonnes |
Excavation requirements reflected contamination concentrations, soil characteristics, groundwater conditions and future development plans.
Spill Assist coordinated the controlled excavation of approximately 3,240 tonnes of hydrocarbon-contaminated soil.
Excavated materials were segregated according to their contamination characteristics and appropriate waste classification.
The soil removal programme incorporated:
Controlled excavation of identified contamination zones
Suitable temporary storage arrangements
Waste classification and sampling
Authorised waste transportation
Appropriate contaminated soil treatment and disposal
Excavation validation sampling
The waste management strategy prioritised suitable recovery and treatment options where practicable.
The former depot contained redundant underground fuel storage tanks, transfer pipelines and associated drainage infrastructure.
Spill Assist coordinated specialist contractors responsible for the appropriate decommissioning and removal of selected redundant infrastructure.
Residual hydrocarbons and contaminated materials were recovered and managed through suitable waste disposal arrangements.
Eight groundwater monitoring wells supported the assessment of possible contaminant migration.
Groundwater samples were collected for laboratory analysis to establish contamination trends and inform subsequent remediation activities.
Suitable hydrocarbon recovery methods were implemented where recoverable free-phase contamination was identified.
Ongoing monitoring requirements were documented separately from the principal excavation programme.
Following contaminated soil removal, validation samples assessed residual contamination within the excavated zones.
Suitable replacement materials reinstated the excavations according to the agreed development specification.
The environmental remediation report incorporated:
Site investigation findings
Contamination assessments
Excavation records
Soil classification results
Waste transportation and disposal records
Laboratory validation results
Groundwater monitoring findings
Recommendations for continued environmental management
The documentation supported the customer's subsequent development decisions, subject to relevant regulatory requirements and outstanding monitoring conditions.
Fenwick Commercial Land Developments received a coordinated contaminated land remediation programme supporting its proposed logistics development.
The project delivered:
Environmental investigation of a 28,400m² former fuel depot
Remediation across 4,860m² of contaminated land
Excavation of 3,240 tonnes of contaminated soil
Installation of eight groundwater monitoring wells
Assessment of redundant fuel storage infrastructure
Controlled hydrocarbon recovery
Environmental validation sampling
Comprehensive waste management and remediation documentation
The principal remediation works were completed within 45 working days and the agreed £386,400 budget.
Project Takeaway: Contaminated soil removal supports commercial land redevelopment because targeted excavation, waste classification and environmental validation address historical pollution risks before construction progresses.
Project: Multi-site emergency fuel spill recovery and forecourt cleaning
Customer: Christopher Dalrymple
Company: Dalrymple National Forecourt Services
Location: Bristol, Swindon, Reading, Oxford, Gloucester and Cheltenham
Number of Fuel Forecourts: 6
Combined Spill Volume: Approximately 13,600 litres
Combined Affected Area: 5,120m²
Project Value: £84,750
Combined Project Duration: 15 working days
Services: Emergency spill response, 24-hour spill response, fuel spill response, diesel spill response and spill clean-up
Dalrymple National Forecourt Services required specialist emergency spill response across six commercial petrol stations following separate fuel delivery, storage and transfer incidents.
The incidents involved petrol and diesel contamination affecting customer refuelling areas, tanker delivery compounds and surface water drainage infrastructure.
The customer required rapid emergency attendance to manage environmental and safety risks while limiting disruption to forecourt trading operations.
Forecourt Location | Fuel Type | Spill Volume | Affected Area |
|---|---|---|---|
Bristol | Diesel | 3,200 litres | 1,180m² |
Swindon | Petrol | 1,800 litres | 740m² |
Reading | Diesel | 2,600 litres | 960m² |
Oxford | Petrol | 1,400 litres | 580m² |
Gloucester | Diesel | 2,800 litres | 1,020m² |
Cheltenham | Petrol | 1,800 litres | 640m² |
Total | Petrol and diesel | 13,600 litres | 5,120m² |
Each incident received a separate assessment based on fuel characteristics, contamination extent, drainage arrangements and ongoing forecourt activities.
Spill Assist coordinated specialist emergency response personnel and suitable recovery equipment across the six separate incidents.
Attendance times ranged from 65 to 115 minutes, depending on the incident location and response requirements.
The response teams coordinated their activities with forecourt management personnel and relevant emergency services where necessary.
The containment arrangements reflected the different characteristics and hazards associated with petrol and diesel.
Specialist equipment was selected according to the relevant substance, site conditions and identified risks.
The combined containment programme addressed:
Six commercial fuel delivery compounds
Multiple customer refuelling areas
Twenty-eight potentially affected drainage points
Contaminated vehicle circulation routes
Accessible oil-water separation infrastructure
Adjoining pedestrian and commercial areas
The response teams restricted access to affected areas during recovery and cleaning activities.
Specialist fuel recovery equipment removed accessible accumulated petrol, diesel and contaminated liquids.
The combined recovery programme collected approximately 12,200 litres of bulk fuel and contaminated liquids.
Additional cleaning activities generated approximately 11,600 litres of contaminated wastewater.
Recovered materials were classified and managed through appropriate waste recovery and disposal arrangements.
Spill Assist coordinated the cleaning of 5,120m² of affected forecourt surfaces across the six locations.
The drainage assessment programme incorporated:
Inspection of twenty-eight drainage points
Assessment of approximately 460 linear metres of drainage infrastructure
Inspection of six oil-water separators
Recovery of contaminated liquids from accessible chambers
Investigation of potential downstream pollution pathways
Individual environmental assessments informed decisions regarding further cleaning, monitoring and reinstatement requirements.
Each forecourt received incident documentation outlining the affected areas, containment activities, recovered materials and waste management arrangements.
The response teams coordinated with relevant site management personnel regarding the phased reopening of affected forecourt sections.
Where necessary, recommendations addressed continued environmental monitoring and infrastructure repairs by appropriate specialist contractors.
Dalrymple National Forecourt Services received coordinated emergency fuel spill response services across six commercial petrol stations.
The combined projects delivered:
Emergency attendance within 65 to 115 minutes
Management of six separate fuel spill incidents
Response to approximately 13,600 litres of spilled petrol and diesel
Cleaning of 5,120m² of forecourt surfaces
Recovery of approximately 23,800 litres of contaminated liquids
Assessment of twenty-eight drainage points
Inspection of six oil-water separators
Individual incident and waste disposal documentation
The combined recovery programme was completed within 15 working days and the agreed £84,750 budget.
Project Takeaway: Emergency forecourt spill response helps minimise commercial disruption because substance-specific containment, controlled fuel recovery and drainage assessment support the phased reinstatement of affected trading areas.
Project: Large-scale dockside oil spill containment and environmental clean-up
Customer: Nicholas Fairburn
Company: Fairburn Maritime and Cargo Operations
Location: Hull, East Yorkshire
Dockside Facility Area: 92,600m²
Spill Volume: Approximately 21,400 litres
Affected Dockside Area: 4,680m²
Emergency Response Time: 100 minutes
Project Value: £136,800
Project Duration: 10 days
Services: Oil spill response, emergency spill response, industrial spill response, environmental remediation and spill waste disposal
Fairburn Maritime and Cargo Operations experienced a significant oil release following damage to industrial oil transfer infrastructure within its commercial dockside facility.
Approximately 21,400 litres of heavy fuel oil escaped onto operational quayside surfaces, with a proportion reaching adjacent dock waters.
The incident affected cargo handling operations and presented potential environmental risks to surrounding marine areas.
The customer required coordinated land-based and waterborne spill response services capable of managing substantial hydrocarbon contamination.
Spill Assist assessed the affected dockside areas in coordination with the customer's incident management representatives and relevant harbour personnel.
The initial assessment identified:
Approximately 4,680m² of contaminated dockside hardstanding
Oil accumulation around cargo handling infrastructure
Contaminated surface water drainage channels
Floating oil within adjacent dock waters
Potential migration towards neighbouring berths
Environmental risks associated with marine contamination
The recovery programme considered prevailing weather conditions, tidal influences, vessel movements and operational restrictions.
Specialist marine containment equipment restricted the movement of floating hydrocarbons where environmental conditions permitted.
The containment programme incorporated:
Approximately 680 linear metres of floating containment booms
420 linear metres of oil-selective absorbent booms
Temporary dockside liquid containment barriers
Specialist hydrocarbon absorbent materials
Drainage protection equipment
The response team monitored containment performance throughout the recovery operation.
Spill Assist coordinated specialist vacuum recovery vehicles and suitable waterborne oil recovery equipment.
The recovery programme addressed accumulated hydrocarbons across the dockside and accessible floating oil within the affected water environment.
Approximately 32,800 litres of oil-water mixture and contaminated liquids were recovered during the principal recovery phase.
The recovered volume exceeded the original spill volume because the collected liquids included water and other contaminated residues.
The surface cleaning programme addressed four principal operational areas.
Contaminated Area | Cleaned Surface Area |
|---|---|
Main cargo handling compound | 1,680m² |
Oil transfer infrastructure area | 1,240m² |
Quayside access routes | 1,160m² |
Equipment storage compound | 600m² |
Total | 4,680m² |
Suitable cleaning equipment removed residual oil contamination from compatible operational surfaces.
Approximately 9,200 litres of contaminated cleaning liquids were recovered for appropriate treatment and disposal.
The combined waste recovery programme generated:
Approximately 32,800 litres of oil-water mixture and contaminated liquids
Approximately 9,200 litres of contaminated cleaning wastewater
Approximately 5.4 tonnes of spent absorbents and contaminated solid materials
Recovered materials were classified, segregated and transported through authorised waste management arrangements.
Waste records documented the recovered quantities and relevant treatment or disposal destinations.
Environmental monitoring assessed residual contamination within affected dockside and adjacent water environments.
The response programme incorporated inspection of accessible drainage infrastructure and assessment of potential contamination migration beyond the immediate incident area.
Localised remediation addressed contaminated materials around selected infrastructure and perimeter areas.
Recommendations for continued monitoring were coordinated with the customer's environmental representatives and relevant authorities where required.
Fairburn Maritime and Cargo Operations received an integrated emergency oil spill response addressing contamination across land and water environments.
The project delivered:
Emergency attendance within 100 minutes
Response to approximately 21,400 litres of spilled heavy fuel oil
Deployment of 680 linear metres of floating containment booms
Cleaning of 4,680m² of operational dockside surfaces
Recovery of approximately 42,000 litres of contaminated liquids
Collection of 5.4 tonnes of contaminated solid materials
Environmental monitoring and targeted remediation
Documented spill waste management
Phased reinstatement of dockside cargo operations
The principal containment, recovery and environmental clean-up works were completed within ten days and the agreed £136,800 budget.
Project Takeaway: Specialist marine oil spill response reduces environmental pollution risks because coordinated waterborne containment, land-based recovery and environmental monitoring address hydrocarbon contamination across interconnected operational areas.
Spill Assist provides 24-hour emergency spill response, chemical spill response, contaminated soil removal, diesel spill response, environmental remediation, fuel spill response, hazardous spill response, industrial spill response, oil spill response, spill clean-up and spill waste disposal services throughout the UK.
Our team supports commercial property owners, industrial manufacturers, transport operators, fuel storage facilities, construction companies and marine operators following accidental spill incidents and historical environmental contamination.
We coordinate specialist containment, recovery, cleaning and remediation services according to the substance involved, incident severity, operational requirements and environmental risks.